The Agenda of Determination of Abnormal Transport (oversized, excessive) Routes is a part of complex Agenda of specific Road use as amended by the Road Act.
Transport Routes for Transports which weight is 60 t and more or which height is 4,5 m and more are determined directly by staff of Road Databank itself.
Transport Routes for Transports which weight or height is under values mentioned above need to be approved by Road Databank. In this case the Route Determination is realized by Transportation companies through web based software within Information System of Road Network Model.
System for Determination of Abnormal Transport Routes is operated within Information System of Road Network Model and uses Data of Central technical Register of Roads and results from technical inspections of Bridges stored in Database of Bridge Management System.
Since January 1st, 2016 there is possibility of multiple (repeated) transports with duration of maximum three or six months. These multiple transports are charged two and half times or five times more as a charge of single transport or transport intention.
- up to 60 t the transport is permitted during time period of maximum six month and
- 60 t and more the transport is permitted during time period of maximum three month.
Technical Conditions TP 103 Excessive and oversized transport were approved by Ministry of Transport and Construction of the Slovak Republic and taken into force since 20.05.2021.
Type of the transport :
- Transport with the total mass up to 40 tonnes with the height or widht up to 4,50 m
- Transport with the total mass over 40 tonnes with the height or widht up to 4,50 m
- Transport with the total mass over 60 tonnes with the height or widht over 4,50 m